H & W Lift and Shift removed all the ductwork, walkways, hand rail, etc, then uplifted the filtration unit using the 2 x cranes, lay over and loaded it onto one of our extendable low loader trailer, we then delivered the unit to Trafford park and off loaded to storage.
29.03.14