H & W Lift and Shift recently completed the,
Re-location of a complete engineering workshop for a national utility company, this included disconnection of electrics, split machinery where required, load to transport and re-located to new premises, there off load, position, lined, levelled, fasten down and reconnected electrics etc.
12.07.12