Tel:0161 330 7631 Email: enquiries@hanlonandwright.co.uk

H&W Engineers recently carried out the removal out 1 x Production Line from Greater Manchester and installation in Southern Spain.

Our engineers match marked the line, disconnected services (air, electrics, etc), dismantled using fork lift trucks, cherry picker, scissor.

Loaded to incoming transport.

In Spain we then un-loaded the line, positioned to instructions, re-built, lined levelled, secured and re-connected the services.