Off loading and positioning of 6 ton packing machine in North Wales.
Here we have H & W Lift and Shift engineers of loading a 6 ton packing machine at premises in North Wales.
The machine was offloaded using a 50 ton crane and lowered onto machine moving skates at the building entrance.
We then skated the machine in to the building using one of our 7 ton Hyster fork lift trucks.
Once in position our engineers connected the services electrical, lined, levelled and fasten down.
We also off loaded and positioned a smaller 4 ton packing machine, connected the electrics, lined, levelled and secured.