Installation of 20 ton Cremator and Abatement Plant in Berkshire

  At a Crematorium in Berkshire. The 20...

Installation of Chimney stack

  H & W Lift and Shift were...

Installation of packaging line

  At a manufacturing company in...

Hanlon & Wright aid underprivileged children in Kenya

  We are delighted to say we have been...

Removal of plant room equipment

  From a manufacturing Company in...

Internal movement of Mixing machines

  Once we had disconnected all of the...

Dismantling of manufacturing line for shipment to India

Today we have started the dismantling of a...

Removal of 12 ton vessel and installation of new

  The vessel was lowered to the ground...

Installation of mixing machines

  The machines were off loaded using one...

2nd cremator and abatement plant installation

  This installation was at a crematorium...

Installation of 4 x 600kg boilers

  These we're uplifted to the 2nd...

Removal of Printing machinery

  Loading printing machinery at a...

H & W Lift and Shift supports Kits2Kids charity

  Who recently called into our depot in...

Removal of 3 storey platform and walkway.

  From a Company in Lancashire, which...

Installation of 10 ton Engraving machine

  At a company in north Manchester, we...

Vehicles being loaded ready for Lithuania

  Prior to leaving for Lithuania, where...

Off loading of 11 ton chiller units

H & W Lift and Shift recently took...

Dismantle and removal of Accumulator

H & W Lift and Shift have just completed...

Cremator and Abatement plant installation

H & W Lift and Shift install Cremator...

Re-location of complete engineering workshop

H & W Lift and Shift recently completed...

Installation of medical equipment

  With Filter dryer, 2 x receivers and...

Compressor change over

H & W Lift and Shift carried out at a...

H & W Lift and Shift supports Kits2Kids charity

  Who recently called into our depot in...

Emergency chiller unit to France

  Along with all the pipe work, fittings...

Removal and installation of new corrigater line

  The removal and installation of a new...

Dismantle and removal of mixer plant

H & W Lift and Shift has just completed...

Stainless steel vessel installation

  Delivered to a chemical manufacturing...

Installation of Blower unit, etc.

H & W Lift and Shift have just...

Delivery of medical equipment

  H & W Lift and Shift, delivered 2...

Removal of stranded excavator

  A mobile excavator from behind...

SNOW STORM

During the unexpected snow storm last...

Completion of relocation to India

Following the completion of the...

100 year old OHTC

  100 year old OHTC, taking...

Liebherr crane lift

  Aided with the rigging of a Liebherr...

Installation of medical equipment

  The installation of medical equipment...

Emergency chiller unit

  For delivery to mid Cheshire, where H...

Back to full strength this week

After the 2nd group of men, Completed their...

Installation of 2 x Injection moulding machines

  2 x injection moulding machines (6...

2 x compressor change over

  Carry out a compressor change over at...

Installation of air handling units at MRI

  Exchanged 2 x air handling units at...

Re-location of 3 x Glass Lined Vessels

    of 3 x glass lined vessels at a...

Manufacturing Plant to South America

H & W Lift and Shift have today been...

Scammel tractor unit with 4 in line low loader

  Which was part of a factory removal...

Dished end off a silo

  Which H & W Lift and Shift...

Chiller unit installation

  Loaded and ready to be delivered to a...

Glass lined reactor

  H & W Lift and Shift carefully...

Northants to Europe

H & W Lift and Shift have just...

42ton vessel Wirral to Europe

  From an oil plant on the wirral,...

Friction simulators to Leeds

Delivered 2 x Friction Simulators to...

Installation of bag making line.

H & W Lift and Shift engineers recently...