At a manufacturing company in Lancashire, once we had off loaded the machinery from incoming containers, we positioned the line using a versa lift and a 7 ton fork lift truck, we then built up the line as per the manufacturers guidelines, connected all services, lined, levelled and fastend down.
16.11.12