Installation of Abatement plant.
In the first picture we have one of our front mounted Hiab type cranes, we collected this aero cooler from premises in France and delivered to site in the North of England.
The aero cooler was then up into position on the roof top along with sections of flu's and fans.
Once craned into the building the flu sections were then winched into position and bolted together.
We then lined and levelled the aero cooler and fans, secured and connected the services.