H & W Lift and Shift carried out at a major store in Newcastle upon Tyne,

The 750kg compressor was taken to the roof area using the goods lift, H & W Lift and Shift then set up a 2t gantry, clamps, c/blocks on the floor to where the plant room is situated, the compressor was lifted up and positioned within the chiller unit, once the old compressor had been removed and loaded to transport.