Chiller unit installation
Here we have H & W Lift and Shift engineers connecting the services (pipework and electrics) on a chiller unit which we exchanged with the use of one of our 7 ton fork lift trucks at a manufacturing company in the North East of England.
The old unit was jacked up, skated to the fork lift truck, the unit was then loaded onto H & W Lift and Shift transport for removal from site, the new unit was then off loaded from transport traversed into position and skated onto the concreate base, lined, levelled and secured.