26
Oct
Re-location of 9.5 ton Grinder.
Our engineers recently uplifted and re-sitted this 9.5 ton grinder. Once our electricians had dis-connected the electrics our engineers jacked up the grinder and skated the machine through the building to the loading bay area, the machine was then loaded onto one of our...