Exchanging of chiller units

  Once H & W Lift and Shift had disconnected the services and removed duct work connected to the 2 x chiller units, we craned the old units down, new steel bases were craned up then bolted together by our engineers, we then craned the 2 x new chiller units up into...
06
Aug

Installation of textile machinery

  The looms were off loaded from incoming containers using one of our front loaded hiab type cranes, positioned within the factory using one of our 7 ton fork lift trucks, where we then secured, lined, levelled and connected the services. 02.05.14
06
Aug

Removal of stainless steel vessels

  Using one of our extendable step frame trailers fitted with a front mounted hiab type crane and one of our rigid vehicles fitted with front mounted hiab type crane and draw bar trailer, the vessel's we're uplifted and lay over using one of our 7 ton fork...
06
Aug

Fabrication and installation of pipe bridge

  Once completed we delivered the pipe bridge to a Chemical manufacturing plant in Derbyshire, it was erected using one of our rear mounted hiab type cranes, then bolted together,A lined, levelled and secured. 15.04.14
06
Aug

Delivery and installation of 18 ton roller

  We then delivered to a Company in Cheshire, once off loaded using a mobile crane we then skated the roller into position then lifted onto a grinding machine with the aid of an iron fairy and the overhead travelling crane. 06.04.14
06
Aug

Removal of filtration unit

  H & W Lift and Shift removed all the ductwork, walkways, hand rail, etc, then uplifted the filtration unit using the 2 x cranes, lay over and loaded it onto one of our extendable low loader trailer, we then delivered the unit to Trafford park and off loaded to...
06
Aug

12 ton CNC grinder installation

  H & W Lift and Shift off loaded the grinding machine from incoming transport, the main section was craned onto a platform then skated into position using a winch system, we then off loaded the bath section and skated into position, when in position we...
06
Aug

Relocation of window manufacturing machinery

  We disconnected the electrics, jacked up and skated the machinery outside using a 7 ton fork lift truck, loaded to transport with one of our rigid vehicles fitted with a front mounted hiab type crane, delivered to our clients new premises, off loaded using the...
06
Aug

9 ton machine

  Using one of our rear mounted hiab type cranes, once loaded onto our vehicle the machine was transported to a manufacturing company in Cumbria, where we off loaded using the hiab type crane, skated through the factory into position, then fastened down, lined,...
06
Aug

Installation of 6 ton chiller units

  At a major NHS Hospital in the North West of England, Using a 160 ton crane the units were craned into position where we levelled the units on anti-vibration mounts and secured. 25.02.14